Work Bee October Ideas Aug 2026

  • Repaint other out-houses! Paint is “Deck Correct” in the water closet by the water heater.

  • Paint the inside of the out-houses white! Paint is in the water closet by the water heater.

  • Replace front gate support post with a railroad tie or power-pole

  • Repaint with bright yellow the numbers on the site posts; there is marking paint in the shed

  • Cut, Split the wood by the pole-barn into 1 foot pieces & put newly cut or spilt into pole-barn

  • Cut, the falling wood in the woods along the roads  & near the pond into 1 foot pieces

  • Cut, the fallen trees near the building into 1 foot pieces and split, then put in wood shed

  • Cut the wood in the pole-barn into 1 foot pieces and then split as needed

  • Put up NO-trespassing signs on west side of property?

  • String old power wire coiled by garage thru the trees on the east side of the lower parking lot road about 4 foot off the ground to slow down would be thieves

  • String old power wire coiled by garage thru the trees on the west side of the property

  • Regrade and widen roads along the north side of property,

  • Take inventory of the stuff in and on top of the cabinets in the garage,

  • Power Wash the Building

  • Cut back the briers along the roads & pick up sticks along the roads and in the fields  

  • Move the pile of disassembled wood sheds to the swampy area west of the pond

  • Put the 3-point drag plow into Pole-barn

  • Put woodpecker proof Gables on both ends of the Bunkhouse.

  • Joe is working on the canoe trailer that is out   

  • On going: - pick up sticks along the roads and in the fields    

    • Trim with Weed-Wacker around Shed, all the Outhouses, trail going down to Miller Creek, Obstacle Course, along the road where briers are encroaching, campsites, & behind pole-barn

    • Trim the branches encroaching on the roads going around the Campgrounds especially on the north road to the east of the outhouse